top of page

Full Scale 1MW Wave Energy airWAVE™ Turbine Power Take-Off System Demonstration (1)

Thu, Sep 13

|

Guanyin District

Aquanet Power proudly invites you to the viewing of our unique first of its kind, full scale 1 MW airWAVE™ Turbine PTO System demonstration facility. Equipped with capabilities to simulate global wave conditions, we will demonstrate the system output and performance in any given condition.

Registration is closed for this event.
Thank you
Full Scale 1MW Wave Energy airWAVE™ Turbine Power Take-Off System Demonstration (1)
Full Scale 1MW Wave Energy airWAVE™ Turbine Power Take-Off System Demonstration (1)

Time & Location

Sep 13, 2018, 12:00 PM – 4:00 PM

Guanyin District, Guanyin District, Taoyuan City, Taiwan 328

About the event

This tour is part of the technical tour offered in conjunction with the AWTEC 2018 conference. For delegates who have registered to take part in the tour, you will depart from the NTOU campus after the NTOU technical tour at around 12.00 noon. Buses will depart the NTOU test site at around 12.00 noon. Anticipated arrival at the PTO site in Taoyuan is 1.20pm. The tour will take in total 3.5 hours including travel time. At the end of the tour, buses will depart from the PTO site and drop off at the conference venue in Taipei.

Share this event

bottom of page